Feasibility Studies
Feasibility Studies

2017 10-Year Facilities Feasibility Study
- Introduction
 - Facility Condition Analysis – HES
 - Facility Condition Analysis – WIS
 - Facility Condition Analysis – WMS
 - Facility Condition Analysis – WHS
 - Facility Program Utilization – Part 1
 - Facility Program Utilization – Part 2
 - Conceptual Facilities Design Options – HES
 - Conceptual Facilities Design Options – WIS
 - Conceptual Facilities Design Options – WMS
 - Conceptual Facilities Design Options – WHS
 - Conceptual Facilities Design Options – Campus Master Plan
 - School Enrollment Analysis and Projections – Part 1
 - School Enrollment Analysis and Projections – Part 2
 - Appendix – Part 1
 - Appendix – Part 2
 - Appendix – Part 3
 

Facilities Feasibility Study - Phase 2
- Phase 2 Feasibility Study Preliminary Report
 - Reconfiguration Scenario Matrix 12.13.18
 - Reconfiguration Scenario Matrix 12.21.18
 - Analysis of Three Site Scenarios and Options
 - WHS and WMS Site Analysis
 - WMS Conceptual Program Needs
 - WHS School Program
 - WIS as Middle School Program
 - WIS Site Analysis
 - WMS Conceptual Program Needs
 - WMS Conceptual Floor Plan
 - Conceptual Large Elementary School Program
 - HES Site Analysis
 - WIS as Middle School Conceptual Floor Plan
 - HES Conceptual Site Plan
 - HES Conceptual Floor Plan
 - WMS Conceptual Site Plan
 - WMS Conceptual New Floor Plan
 - WMS Conceptual New Floor Plan 2nd Floor
 - 4 Site Versus 3 Site Cost Comparison
 
                        
                        
                        Additional settings for Safari Browser.
                        
                        
                    
                